It is no secret that construction projects in midtown Manhattan pose a myriad of unique challenges. From union restrictions to logistics limitations for deliveries, this project required expert coordination from our team in order to achieve this timeline.
The scale of the project required concurrent phases to be constructed simultaneously, in addition to the complexity of the kraftwerk scope which needed to be completed before finished surfaces were installed. This required phased installations which were supported by digital fabrication, allowing components to be fabricated separately and align with digital accuracy on-site.